Substation Scout

SPP request GEN-2025-SR13

SPP queue ID GEN-2025-SR13

Queue request GEN-2025-SR13 was listed in the SPP interconnection queue at the end of 2025 as a 130 MW project in Seminole County, OK, according to Berkeley Lab’s queue data file. The filing names Seminole Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 1, 2029.

Queue IDGEN-2025-SR13
Project nameNot reported
Status (as published)Active
SubstationSeminole Substation
Point of interconnectionSeminole Substation
CountySeminole
StateOK
VoltageNot reported
Capacity130 MW
Resource (as published)Other
Resource categoryOther (normalized for filtering)
Proposed online date2029-12-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Seminole Substation substation: 3 requests in the SPP queue, 3 active totaling 861 MW.

Queue IDProjectMWResourceStatus
GEN-2024-321Not reported493GasActive
GEN-2025-SR10Not reported238OtherActive

Seminole, OK: 6 requests in the SPP queue, 4 active totaling 1,021 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityOG&E
ClusterSurplus; 04 SOUTHEAST
Interconnection serviceERIS
Project typeSurplus
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Study phase (as the queue printed it)None
Queue date2025-05-31

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first