4 active projects totaling 1,021 MW in the SPP queue, plus 2 with terminal status (shown grayed).

4active projects
1,021active MW
6total filed
Queue IDProjectkVMWResourceStatus
GEN-2000-014 Not reported n/r 1,300 Gas Withdrawn
GEN-2024-321 Not reported 345 493 Gas Active
GEN-2025-SR10 Not reported 345 238 Other Active
GEN-2024-360 Not reported 138 160 Hybrid Active
GEN-2025-SR13 Not reported n/r 130 Other Active
GEN-2021-SR1 Not reported n/r 81.6 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.