SPP request GEN-2024-369

SPP queue ID GEN-2024-369

Queue request GEN-2024-369 was listed in the SPP interconnection queue at the end of 2025 as a 250 MW battery project in Grady County, OK, according to Berkeley Lab’s queue data file. The filing names Cornville Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of March 1, 2028.

Queue IDGEN-2024-369
Project nameNot reported
Status (as published)Active
SubstationCornville Substation
Point of interconnectionCornville 138 kV Substation
CountyGrady
StateOK
Voltage138 kV
Capacity250 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2028-03-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Grady, OK: 25 requests in the SPP queue, 16 active totaling 2,557.7 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAEP
ClusterDISIS-2024-001; 04 SOUTHEAST
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)System Impact Study
Study phase (as the queue printed it)DISIS STAGE
Queue date2025-03-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.