Substation Scout

SPP request GEN-2024-327

SPP queue ID GEN-2024-327

Queue request GEN-2024-327 was listed in the SPP interconnection queue at the end of 2025 as a 200 MW battery project in Ward County, ND, according to Berkeley Lab’s queue data file. The filing names Berthold Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of January 1, 2028.

Queue IDGEN-2024-327
Project nameNot reported
Status (as published)Active
SubstationBerthold Substation
Point of interconnectionBerthold 115 kV Substation
CountyWard
StateND
Voltage115 kV
Capacity200 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2028-01-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Ward, ND: 7 requests in the SPP queue, 4 active totaling 407.7 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityCPEC
ClusterDISIS-2024-001; 01 NORTH
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)System Impact Study
Study phase (as the queue printed it)DISIS STAGE
Queue date2025-03-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first