Substation Scout

SPP request GEN-2024-325

SPP queue ID GEN-2024-325

Queue request GEN-2024-325 was listed in the SPP interconnection queue at the end of 2025 as a 150 MW battery project in Chaves County, NM, according to Berkeley Lab’s queue data file. The filing names Sierra Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of January 1, 2028.

Queue IDGEN-2024-325
Project nameNot reported
Status (as published)Active
SubstationSierra Substation
Point of interconnectionSierra 115 kV Substation
CountyChaves
StateNM
Voltage115 kV
Capacity150 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2028-01-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Chaves, NM: 39 requests in the SPP queue, 14 active totaling 2,098.7 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilitySPS
ClusterDISIS-2024-001; 05 SOUTHWEST
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)System Impact Study
Study phase (as the queue printed it)DISIS STAGE
Queue date2025-03-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.