SPP request GEN-2024-324

SPP queue ID GEN-2024-324

Queue request GEN-2024-324 was listed in the SPP interconnection queue at the end of 2025 as a 160 MW battery project in Chaves County, NM, according to Berkeley Lab’s queue data file. The filing names Samson Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of January 1, 2028.

Queue IDGEN-2024-324
Project nameNot reported
Status (as published)Active
SubstationSamson Substation
Point of interconnectionSamson 115 kV Substation
CountyChaves
StateNM
Voltage115 kV
Capacity160 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2028-01-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Chaves, NM: 39 requests in the SPP queue, 14 active totaling 2,098.7 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilitySPS
ClusterDISIS-2024-001; 05 SOUTHWEST
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)System Impact Study
Study phase (as the queue printed it)DISIS STAGE
Queue date2025-03-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.