SPP request GEN-2024-295

SPP queue ID GEN-2024-295

Queue request GEN-2024-295 was listed in the SPP interconnection queue at the end of 2025 as a 115 MW battery project in Eddy County, NM, according to Berkeley Lab’s queue data file. The filing names S Loving Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 10, 2030.

Queue IDGEN-2024-295
Project nameNot reported
Status (as published)Active
SubstationS Loving Substation
Point of interconnectionS Loving 115 kV Substation
CountyEddy
StateNM
Voltage115 kV
Capacity115 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2030-06-10
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Eddy, NM: 16 requests in the SPP queue, 3 active totaling 439 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilitySPS
ClusterDISIS-2024-001; 05 SOUTHWEST
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)System Impact Study
Study phase (as the queue printed it)DISIS STAGE
Queue date2025-03-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.