Eddy, NM interconnection queue

3 active projects totaling 439 MW in the SPP queue, plus 13 with terminal status (shown grayed).

3active projects
439active MW
16total filed
Queue IDProjectkVMWResourceStatus
GEN-2018-075 Not reported 115 230 Gas Withdrawn
GEN-2024-147 Not reported 115 200.3 Solar Withdrawn
GEN-2001-021 Not reported n/r 200 Other Withdrawn
GEN-2007-001 Not reported n/r 200 Wind Withdrawn
GEN-2023-184 Not reported 115 200 Solar Withdrawn
GEN-2024-246 Not reported 115 199 Battery Active
GEN-2024-347 Not reported 345 199 Battery Withdrawn
GEN-2006-048 Not reported n/r 150 Wind Withdrawn
GEN-2022-128 Not reported 115 150 Battery Withdrawn
GEN-2024-251 Not reported 115 125 Battery Active
GEN-2024-295 Not reported 115 115 Battery Active
GEN-2014-069 Not reported 115 90 Solar Withdrawn
GEN-2015-058 Not reported 115 50 Solar Withdrawn
GEN-2009-067S Not reported 69 20 Solar Withdrawn
GEN-2010-021 Not reported 69 20 Solar Withdrawn
GEN-2023-187 Not reported 115 20 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first