SPP request GEN-2024-271

SPP queue ID GEN-2024-271

Queue request GEN-2024-271 was listed in the SPP interconnection queue at the end of 2025 as a 250 MW hybrid project in Chaves County, NM, according to Berkeley Lab’s queue data file. The filing names Chaves County - San Juan Wind Line as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 15, 2029.

Queue IDGEN-2024-271
Project nameNot reported
Status (as published)Active
SubstationChaves County - San Juan Wind Line
Point of interconnectionChaves County - San Juan Wind 230 kV Line
CountyChaves
StateNM
Voltage230 kV
Capacity250 MW
Resource (as published)Solar+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2029-12-15
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Chaves, NM: 39 requests in the SPP queue, 14 active totaling 2,098.7 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilitySPS
ClusterDISIS-2024-001; 05 SOUTHWEST
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)System Impact Study
Study phase (as the queue printed it)DISIS STAGE
Queue date2025-03-01
Components (hybrid)Solar 250 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first