SPP request GEN-2024-177
SPP queue ID GEN-2024-177
Queue request GEN-2024-177 was listed in the SPP interconnection queue at the end of 2025 as a 199 MW battery project in Bossier Parish, LA, according to Berkeley Lab’s queue data file. The filing names Red Point Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of January 15, 2029.
| Queue ID | GEN-2024-177 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Red Point Substation |
| Point of interconnection | Red Point 138 kV Substation |
| County | Bossier Parish |
| State | LA |
| Voltage | 138 kV |
| Capacity | 199 MW |
| Resource (as published) | Battery |
| Resource category | Battery (normalized for filtering) |
| Proposed online date | 2029-01-15 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Bossier Parish, LA: 6 requests in the SPP queue, 3 active totaling 1,699 MW.
Tracked changes
Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | AEP |
|---|---|
| Cluster | DISIS-2024-001; 04 SOUTHEAST |
| Interconnection service | NRIS/ERIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | System Impact Study |
| Study phase (as the queue printed it) | DISIS STAGE |
| Queue date | 2025-03-01 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.