3 active projects totaling 1,699 MW in the SPP queue, plus 3 with terminal status (shown grayed).

3active projects
1,699active MW
6total filed
Queue IDProjectkVMWResourceStatus
GEN-2024-379 Not reported 345 1,350 Gas Active
GEN-2022-052 Not reported 345 850 Solar Withdrawn
GEN-2022-051 Not reported 345 325 Battery Withdrawn
GEN-2024-177 Not reported 138 199 Battery Active
GEN-2023-230 Not reported 138 150 Hybrid Active
GEN-2021-104 Not reported 138 100 Hybrid Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.