SPP queue ID GEN-2024-062

Queue request GEN-2024-062 was listed in the SPP interconnection queue at the end of 2025 as a 230 MW battery project in Kingfisher County, OK, according to Berkeley Lab’s queue data file. The filing names Dover SW Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 31, 2028.

Queue IDGEN-2024-062
Project nameNot reported
Status (as published)Active
SubstationDover SW Substation
Point of interconnectionDover SW 138 kV Substation
CountyKingfisher
StateOK
Voltage138 kV
Capacity230 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2028-12-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Kingfisher, OK: 10 requests in the SPP queue, 6 active totaling 1,692.1 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityWFEC
ClusterDISIS-2024-001; 04 SOUTHEAST
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)System Impact Study
Study phase (as the queue printed it)DISIS STAGE
Queue date2024-10-30

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.