Kingfisher, OK interconnection queue

6 active projects totaling 1,692.1 MW in the SPP queue, plus 4 with terminal status (shown grayed).

6active projects
1,692.1active MW
10total filed
Queue IDProjectkVMWResourceStatus
GEN-2016-119 Not reported 345 600 Wind Active
GEN-2008-134 Not reported n/r 300 Wind Withdrawn
GEN-2015-063 Not reported 345 300 Wind Operational
GEN-2016-118 Not reported 138 288 Wind Operational
GEN-2024-062 Not reported 138 230 Battery Active
GEN-2016-032 Not reported 138 200 Wind Operational
GEN-2008-106 Not reported n/r 100 Wind Withdrawn
GEN-2008-107 Not reported n/r 100 Wind Withdrawn
GEN-2018-011 Not reported 138 74.1 Battery Active
GEN-2017-238 Not reported 69 40 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.