SPP request GEN-2024-003

SPP queue ID GEN-2024-003

Queue request GEN-2024-003 was listed in the SPP interconnection queue at the end of 2025 as a 102.2 MW gas project in Franklin County, AR, according to Berkeley Lab’s queue data file. The filing names Fitzhugh as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of November 7, 2025.

Queue IDGEN-2024-003
Project nameNot reported
Status (as published)Active
SubstationFitzhugh
Point of interconnectionFitzhugh 161kV
CountyFranklin
StateAR
Voltage161 kV
Capacity102.2 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2025-11-07
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Fitzhugh substation: 2 requests in the SPP queue, 1 active totaling 102.2 MW.

Queue IDProjectMWResourceStatus
GEN-2015-019Not reported60GasWithdrawn

Franklin, AR: 7 requests in the SPP queue, 5 active totaling 501.3 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAECC
ClusterDISIS-2024-001; 04 SOUTHEAST
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)System Impact Study
Study phase (as the queue printed it)DISIS STAGE
Queue date2024-04-25
Operational date2025-11-07

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.