Franklin, AR interconnection queue

5 active projects totaling 501.3 MW in the SPP queue, plus 2 with terminal status (shown grayed).

5active projects
501.3active MW
7total filed
Queue IDProjectkVMWResourceStatus
GEN-2021-033 Not reported 161 204.1 Solar Active
GEN-2022-049 Not reported 161 150 Battery Withdrawn
GEN-2024-003 Not reported 161 102.2 Gas Active
GEN-2017-231 Not reported 161 72.5 Solar Active
GEN-2024-SR2 Not reported 161 72.5 Battery Active
GEN-2015-019 Not reported 161 60 Gas Withdrawn
GEN-2024-312 Not reported 161 50 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.