SPP request GEN-2023-SR12

SPP queue ID GEN-2023-SR12

Queue request GEN-2023-SR12 was listed in the SPP interconnection queue at the end of 2025 as a 120 MW battery project in Cochran County, TX, according to Berkeley Lab’s queue data file. The filing names Tap Cochran to Lehman Line as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 30, 2025.

Queue IDGEN-2023-SR12
Project nameNot reported
Status (as published)Active
SubstationTap Cochran to Lehman Line
Point of interconnectionTap Cochran to Lehman 115 kV Line
CountyCochran
StateTX
Voltage115 kV
Capacity120 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2025-09-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Cochran, TX: 4 requests in the SPP queue, 2 active totaling 270 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityXcel
ClusterSurplus; 05 SOUTHWEST
Interconnection serviceERIS
Project typeSurplus
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/ON SCHEDULE
Queue date2023-02-13
Operational date2025-09-30

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.