Cochran, TX interconnection queue
2 active projects totaling 270 MW in the SPP queue, plus 2 with terminal status (shown grayed).
2active projects
270active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2022-227 | Not reported | 230 | 244 | Solar | Withdrawn |
| GEN-2015-014 | Not reported | 115 | 150 | Wind | Operational |
| GEN-2023-SR12 | Not reported | 115 | 120 | Battery | Active |
| GEN-2022-027 | Not reported | 115 | 55 | Battery | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.