SPP queue ID GEN-2023-206

Queue request GEN-2023-206 was listed in the SPP interconnection queue at the end of 2025 as a 50 MW battery project in Sebastian County, AR, according to Berkeley Lab’s queue data file. The filing names Battlefield BESS Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 31, 2029.

Queue IDGEN-2023-206
Project nameNot reported
Status (as published)Active
SubstationBattlefield BESS Substation
Point of interconnectionBattlefield BESS 161 kV Substation
CountySebastian
StateAR
Voltage161 kV
Capacity50 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2029-12-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Sebastian, AR: 6 requests in the SPP queue, 2 active totaling 250 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityOGE
ClusterDISIS-2023-001; 04 SOUTHEAST
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Facility Study
Study phase (as the queue printed it)FACILITY STUDY STAGE
Queue date2023-10-02

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first