Sebastian, AR interconnection queue
2 active projects totaling 250 MW in the SPP queue, plus 4 with terminal status (shown grayed).
2active projects
250active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2000-006 | Not reported | n/r | 660 | Gas | Withdrawn |
| GEN-2000-012 | Not reported | n/r | 660 | Gas | Withdrawn |
| GEN-2022-130 | Not reported | 161 | 200 | Battery | Active |
| GEN-2023-180 | Not reported | 161 | 150 | Solar | Withdrawn |
| GEN-2023-206 | Not reported | 161 | 50 | Battery | Active |
| GEN-2017-002 | Not reported | 69 | 21.6 | Solar | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.
Site Scanner