Substation Scout

SPP request GEN-2023-035

SPP queue ID GEN-2023-035

Queue request GEN-2023-035 was listed in the SPP interconnection queue at the end of 2025 as a 200 MW solar project in Grady County, OK, according to Berkeley Lab’s queue data file. The filing names Cleveland - Amber Tap Line as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 1, 2026.

Queue IDGEN-2023-035
Project nameNot reported
Status (as published)Active
SubstationCleveland - Amber Tap Line
Point of interconnectionCleveland - Amber Tap 138 kV Line
CountyGrady
StateOK
Voltage138 kV
Capacity200 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2026-09-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Grady, OK: 25 requests in the SPP queue, 16 active totaling 2,557.7 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityWFEC
ClusterDISIS-2023-001; 04 SOUTHEAST
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Facility Study
Study phase (as the queue printed it)FACILITY STUDY STAGE
Queue date2023-10-02

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first