SPP request GEN-2023-015

SPP queue ID GEN-2023-015

Queue request GEN-2023-015 was listed in the SPP interconnection queue at the end of 2025 as a 330 MW solar project in Finney County, KS, according to Berkeley Lab’s queue data file. The filing names Finney-Carpenter line as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 1, 2026.

Queue IDGEN-2023-015
Project nameNot reported
Status (as published)Active
SubstationFinney-Carpenter line
Point of interconnectionFinney-Carpenter 345 KV line
CountyFinney
StateKS
Voltage345 kV
Capacity330 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2026-09-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Finney, KS: 22 requests in the SPP queue, 8 active totaling 3,129.5 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilitySPS
ClusterDISIS-2023-001; 03 CENTRAL
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Facility Study
Study phase (as the queue printed it)FACILITY STUDY STAGE
Queue date2023-10-02

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.