Substation Scout

Finney, KS interconnection queue

8 active projects totaling 3,129.5 MW in the SPP queue, plus 14 with terminal status (shown grayed).

8active projects
3,129.5active MW
22total filed
Queue IDProjectkVMWResourceStatus
GEN-2011-030 Not reported 345 1,020 Coal Withdrawn
GEN-2009-021 Not reported 345 895 Coal Withdrawn
GEN-2022-086 Not reported 345 700 Solar Withdrawn
ERAS-2025-017 Not reported 345 600 Gas Active
GEN-2008-011 Not reported n/r 600 Wind Withdrawn
GEN-2023-091 Not reported 345 504 Wind Withdrawn
GEN-2020-057 Not reported 345 424.5 Battery Active
GEN-2020-058 Not reported 345 424.5 Solar Active
GEN-2024-102 Not reported 345 400.5 Wind Active
GEN-2024-103 Not reported 345 400.5 Wind Withdrawn
ERAS-2025-015 Not reported 345 400 Hybrid Active
GEN-2023-015 Not reported 345 330 Solar Active
GEN-2022-207 Not reported 345 300 Hybrid Withdrawn
GEN-2023-107 Not reported 345 300 Wind Active
GEN-2008-018 Not reported 345 250 Wind Operational
GEN-2023-089 Not reported 345 250 Wind Withdrawn
GEN-2023-090 Not reported 345 250 Wind Withdrawn
GEN-2024-101 Not reported 115 220 Wind Withdrawn
GEN-2021-078 Not reported 115 160 Hybrid Withdrawn
GEN-2022-002 Not reported 115 135 Solar Withdrawn
GEN-2019-014 Not reported 115 125 Hybrid Withdrawn
GEN-2020-022 Not reported 115 125 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.