Finney, KS interconnection queue
8 active projects totaling 3,129.5 MW in the SPP queue, plus 14 with terminal status (shown grayed).
8active projects
3,129.5active MW
22total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2011-030 | Not reported | 345 | 1,020 | Coal | Withdrawn |
| GEN-2009-021 | Not reported | 345 | 895 | Coal | Withdrawn |
| GEN-2022-086 | Not reported | 345 | 700 | Solar | Withdrawn |
| ERAS-2025-017 | Not reported | 345 | 600 | Gas | Active |
| GEN-2008-011 | Not reported | n/r | 600 | Wind | Withdrawn |
| GEN-2023-091 | Not reported | 345 | 504 | Wind | Withdrawn |
| GEN-2020-057 | Not reported | 345 | 424.5 | Battery | Active |
| GEN-2020-058 | Not reported | 345 | 424.5 | Solar | Active |
| GEN-2024-102 | Not reported | 345 | 400.5 | Wind | Active |
| GEN-2024-103 | Not reported | 345 | 400.5 | Wind | Withdrawn |
| ERAS-2025-015 | Not reported | 345 | 400 | Hybrid | Active |
| GEN-2023-015 | Not reported | 345 | 330 | Solar | Active |
| GEN-2022-207 | Not reported | 345 | 300 | Hybrid | Withdrawn |
| GEN-2023-107 | Not reported | 345 | 300 | Wind | Active |
| GEN-2008-018 | Not reported | 345 | 250 | Wind | Operational |
| GEN-2023-089 | Not reported | 345 | 250 | Wind | Withdrawn |
| GEN-2023-090 | Not reported | 345 | 250 | Wind | Withdrawn |
| GEN-2024-101 | Not reported | 115 | 220 | Wind | Withdrawn |
| GEN-2021-078 | Not reported | 115 | 160 | Hybrid | Withdrawn |
| GEN-2022-002 | Not reported | 115 | 135 | Solar | Withdrawn |
| GEN-2019-014 | Not reported | 115 | 125 | Hybrid | Withdrawn |
| GEN-2020-022 | Not reported | 115 | 125 | Solar | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.