Substation Scout

SPP request GEN-2022-214

SPP queue ID GEN-2022-214

Queue request GEN-2022-214 was listed in the SPP interconnection queue at the end of 2025 as a 239 MW solar project in Sumner County, KS, according to Berkeley Lab’s queue data file. The filing names Gill - Viola Line Break as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 15, 2028.

Queue IDGEN-2022-214
Project nameNot reported
Status (as published)Active
SubstationGill - Viola Line Break
Point of interconnectionGill - Viola 138 kV Line Break
CountySumner
StateKS
Voltage138 kV
Capacity239 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2028-12-15
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Sumner, KS: 18 requests in the SPP queue, 9 active totaling 2,333.8 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityWERE
ClusterDISIS-2022-001; 03 CENTRAL
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Facility Study
Study phase (as the queue printed it)FACILITY STUDY STAGE
Queue date2023-03-02

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first