Sumner, KS interconnection queue

9 active projects totaling 2,333.8 MW in the SPP queue, plus 9 with terminal status (shown grayed).

9active projects
2,333.8active MW
18total filed
Queue IDProjectkVMWResourceStatus
ERAS-2025-008 Not reported 345 721.1 Gas Active
GEN-2024-026 Not reported 345 721.1 Gas Withdrawn
GEN-2016-104 Not reported 345 400 Wind Withdrawn
GEN-2015-052 Not reported 345 300 Wind Operational
GEN-2025-SR16 Not reported 345 300 Battery Active
GEN-2022-214 Not reported 138 239 Solar Active
GEN-2018-128 Not reported 345 200.2 Wind Active
GEN-2008-127 Not reported 345 200.1 Wind Withdrawn
GEN-2017-121 Not reported 138 200 Wind Active
GEN-2017-185 Not reported 345 200 Wind Withdrawn
GEN-2024-095 Not reported 138 200 Solar Withdrawn
GEN-2011-057 Not reported 138 150 Wind Operational
GEN-2013-044 Not reported n/r 136 Wind Withdrawn
GEN-2015-083 Not reported 138 125 Wind Withdrawn
GEN-2018-049 Not reported 345 120 Solar Active
GEN-2023-113 Not reported 138 117 Solar Withdrawn
GEN-2017-068 Not reported 138 103.5 Solar Active
GEN-2016-060 Not reported 138 25.3 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.