SPP request GEN-2022-155

SPP queue ID GEN-2022-155

Queue request GEN-2022-155 was listed in the SPP interconnection queue at the end of 2025 as a 200 MW battery project in Oklahoma County, OK, according to Berkeley Lab’s queue data file. The filing names Horseshoe Lake Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 31, 2027.

Queue IDGEN-2022-155
Project nameNot reported
Status (as published)Active
SubstationHorseshoe Lake Substation
Point of interconnectionHorseshoe Lake 138 kV Substation
CountyOklahoma
StateOK
Voltage138 kV
Capacity200 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2027-12-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Horseshoe Lake Substation substation: 5 requests in the SPP queue, 5 active totaling 1,659 MW.

Queue IDProjectMWResourceStatus
ERAS-2025-004Not reported763GasActive
ERAS-2025-010Not reported496GasActive
GEN-2018-029Not reported100BatteryActive
GEN-2025-SR22Not reported100OtherActive

Oklahoma, OK: 33 requests in the SPP queue, 19 active totaling 5,200.2 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityOGE
ClusterDISIS-2022-001; 04 SOUTHEAST
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Facility Study
Study phase (as the queue printed it)FACILITY STUDY STAGE
Queue date2023-02-24

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.