SPP request ERAS-2025-010

SPP queue ID ERAS-2025-010

Queue request ERAS-2025-010 was listed in the SPP interconnection queue at the end of 2025 as a 496 MW gas project in Oklahoma County, OK, according to Berkeley Lab’s queue data file. The filing names Horseshoe Lake Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of January 1, 2029.

Queue IDERAS-2025-010
Project nameNot reported
Status (as published)Active
SubstationHorseshoe Lake Substation
Point of interconnectionHorseshoe Lake 138kV Substation
CountyOklahoma
StateOK
Voltage138 kV
Capacity496 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2029-01-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Horseshoe Lake Substation substation: 5 requests in the SPP queue, 5 active totaling 1,659 MW.

Queue IDProjectMWResourceStatus
ERAS-2025-004Not reported763GasActive
GEN-2022-155Not reported200BatteryActive
GEN-2018-029Not reported100BatteryActive
GEN-2025-SR22Not reported100OtherActive

Oklahoma, OK: 33 requests in the SPP queue, 19 active totaling 5,200.2 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityOGE
ClusterERAS-2025-001; 04 SOUTHEAST
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Study phase (as the queue printed it)ERAS
Queue date2025-09-10

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.