SPP request GEN-2022-154

SPP queue ID GEN-2022-154

Queue request GEN-2022-154 was listed in the SPP interconnection queue at the end of 2025 as a 100 MW battery project in Cleveland County, OK, according to Berkeley Lab’s queue data file. The filing names Canadian Switch Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 31, 2027.

Queue IDGEN-2022-154
Project nameNot reported
Status (as published)Active
SubstationCanadian Switch Substation
Point of interconnectionCanadian Switch 138 kV Substation
CountyCleveland
StateOK
Voltage138 kV
Capacity100 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2027-12-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Cleveland, OK: 6 requests in the SPP queue, 3 active totaling 399 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityWFEC
ClusterDISIS-2022-001; 04 SOUTHEAST
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Facility Study
Study phase (as the queue printed it)FACILITY STUDY STAGE
Queue date2023-02-24

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.