Cleveland, OK interconnection queue

3 active projects totaling 399 MW in the SPP queue, plus 3 with terminal status (shown grayed).

3active projects
399active MW
6total filed
Queue IDProjectkVMWResourceStatus
GEN-2000-005 Not reported n/r 825 Gas Withdrawn
GEN-2022-137 Not reported 138 200 Battery Withdrawn
GEN-2024-119 Not reported 138 199 Battery Active
GEN-2000-015 Not reported n/r 180 Gas Withdrawn
GEN-2021-088 Not reported 138 100 Battery Active
GEN-2022-154 Not reported 138 100 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.