SPP request GEN-2022-142
SPP queue ID GEN-2022-142
Queue request GEN-2022-142 was listed in the SPP interconnection queue at the end of 2025 as a 200 MW battery project in Clay County, MO, according to Berkeley Lab’s queue data file. The filing names Shoal Creek Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 31, 2030.
| Queue ID | GEN-2022-142 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Shoal Creek Substation |
| Point of interconnection | Shoal Creek 161 kV Substation |
| County | Clay |
| State | MO |
| Voltage | 161 kV |
| Capacity | 200 MW |
| Resource (as published) | Battery |
| Resource category | Battery (normalized for filtering) |
| Proposed online date | 2030-12-31 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Clay, MO: 8 requests in the SPP queue, 6 active totaling 1,150 MW.
Tracked changes
Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | KCPL |
|---|---|
| Cluster | DISIS-2022-001; 03 CENTRAL |
| Interconnection service | ERIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | Facility Study |
| Study phase (as the queue printed it) | FACILITY STUDY STAGE |
| Queue date | 2023-02-21 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.