SPP request GEN-2022-104

SPP queue ID GEN-2022-104

Queue request GEN-2022-104 was listed in the SPP interconnection queue at the end of 2025 as a 113.1 MW solar project in Bryan County, OK, according to Berkeley Lab’s queue data file. The filing names Brown - South Coleman Junction line as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 1, 2028.

Queue IDGEN-2022-104
Project nameNot reported
Status (as published)Active
SubstationBrown - South Coleman Junction line
Point of interconnectionBrown - South Coleman Junction 138kV line
CountyBryan
StateOK
Voltage138 kV
Capacity113.1 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2028-06-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Bryan, OK: 12 requests in the SPP queue, 7 active totaling 792.5 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityWFEC
ClusterDISIS-2022-001; 04 SOUTHEAST
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Facility Study
Study phase (as the queue printed it)FACILITY STUDY STAGE
Queue date2023-01-26

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.