Bryan, OK interconnection queue

7 active projects totaling 792.5 MW in the SPP queue, plus 5 with terminal status (shown grayed).

7active projects
792.5active MW
12total filed
Queue IDProjectkVMWResourceStatus
GEN-2017-043 Not reported 345 1,550 Gas Withdrawn
GEN-2017-042 Not reported 345 1,100 Gas Withdrawn
GEN-2024-267 Not reported 138 195 Hybrid Active
GEN-2022-136 Not reported 138 180 Battery Active
GEN-2019-034 Not reported 138 120 Gas Withdrawn
GEN-2022-104 Not reported 138 113.1 Solar Active
GEN-2021-001 Not reported 138 100 Battery Active
GEN-2023-214 Not reported 138 100 Battery Withdrawn
GEN-2024-204 Not reported 138 100 Battery Active
GEN-2017-232 Not reported 138 52.2 Solar Active
GEN-2024-SR13 Not reported 138 52.2 Battery Active
GEN-2023-207 Not reported 138 50 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.