SPP request GEN-2022-071

SPP queue ID GEN-2022-071

Queue request GEN-2022-071 was listed in the SPP interconnection queue at the end of 2025 as a 90.8 MW solar project in Pittsburg County, OK, according to Berkeley Lab’s queue data file. The filing names Talawanda to Canadian River Line Tap as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 1, 2028.

Queue IDGEN-2022-071
Project nameNot reported
Status (as published)Active
SubstationTalawanda to Canadian River Line Tap
Point of interconnectionTalawanda to Canadian River 138 kV Line Tap
CountyPittsburg
StateOK
Voltage138 kV
Capacity90.8 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2028-06-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Pittsburg, OK: 14 requests in the SPP queue, 5 active totaling 1,799.8 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAEP
ClusterDISIS-2022-001; 04 SOUTHEAST
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Facility Study
Study phase (as the queue printed it)FACILITY STUDY STAGE
Queue date2022-08-12

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.