SPP request GEN-2022-065

SPP queue ID GEN-2022-065

Queue request GEN-2022-065 was listed in the SPP interconnection queue at the end of 2025 as a 145 MW solar project in Edwards County, KS, according to Berkeley Lab’s queue data file. The filing names tap on Arthur Mullergreen-Spearville line as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of November 19, 2027.

Queue IDGEN-2022-065
Project nameNot reported
Status (as published)Active
Substationtap on Arthur Mullergreen-Spearville line
Point of interconnectiontap on Arthur Mullergreen-Spearville 230 kV line
CountyEdwards
StateKS
Voltage230 kV
Capacity145 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2027-11-19
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Edwards, KS: 17 requests in the SPP queue, 6 active totaling 727 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilitySUNC
ClusterDISIS-2022-001; 03 CENTRAL
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Facility Study
Study phase (as the queue printed it)FACILITY STUDY STAGE
Queue date2022-07-25

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.