Edwards, KS interconnection queue
6 active projects totaling 727 MW in the SPP queue, plus 11 with terminal status (shown grayed).
6active projects
727active MW
17total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2008-060 | Not reported | n/r | 300 | Wind | Withdrawn |
| GEN-2022-204 | Not reported | 345 | 250 | Wind | Withdrawn |
| GEN-2022-205 | Not reported | 345 | 250 | Wind | Withdrawn |
| GEN-2022-206 | Not reported | 345 | 250 | Wind | Withdrawn |
| GEN-2024-195 | Not reported | 345 | 250 | Wind | Withdrawn |
| GEN-2024-196 | Not reported | 345 | 250 | Wind | Withdrawn |
| GEN-2024-197 | Not reported | 345 | 250 | Wind | Withdrawn |
| GEN-2017-021 | Not reported | 345 | 200 | Wind | Withdrawn |
| GEN-2004-014 | Not reported | 230 | 152 | Wind | Operational |
| GEN-2017-099 | Not reported | 345 | 150 | Wind | Withdrawn |
| GEN-2019-055 | Not reported | 230 | 150 | Solar | Active |
| GEN-2025-SR4 | Not reported | 230 | 150 | Battery | Active |
| GEN-2022-065 | Not reported | 230 | 145 | Solar | Active |
| ERAS-2025-019 | Not reported | n/r | 80 | Solar | Active |
| GEN-2016-016 | Not reported | 115 | 78.2 | Wind | Withdrawn |
| GEN-2011-038 | Not reported | 138 | 73.8 | Wind | Withdrawn |
| GEN-2019-053 | Not reported | 230 | 50 | Battery | Active |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.