Edwards, KS interconnection queue

6 active projects totaling 727 MW in the SPP queue, plus 11 with terminal status (shown grayed).

6active projects
727active MW
17total filed
Queue IDProjectkVMWResourceStatus
GEN-2008-060 Not reported n/r 300 Wind Withdrawn
GEN-2022-204 Not reported 345 250 Wind Withdrawn
GEN-2022-205 Not reported 345 250 Wind Withdrawn
GEN-2022-206 Not reported 345 250 Wind Withdrawn
GEN-2024-195 Not reported 345 250 Wind Withdrawn
GEN-2024-196 Not reported 345 250 Wind Withdrawn
GEN-2024-197 Not reported 345 250 Wind Withdrawn
GEN-2017-021 Not reported 345 200 Wind Withdrawn
GEN-2004-014 Not reported 230 152 Wind Operational
GEN-2017-099 Not reported 345 150 Wind Withdrawn
GEN-2019-055 Not reported 230 150 Solar Active
GEN-2025-SR4 Not reported 230 150 Battery Active
GEN-2022-065 Not reported 230 145 Solar Active
ERAS-2025-019 Not reported n/r 80 Solar Active
GEN-2016-016 Not reported 115 78.2 Wind Withdrawn
GEN-2011-038 Not reported 138 73.8 Wind Withdrawn
GEN-2019-053 Not reported 230 50 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.