Substation Scout

SPP request GEN-2021-SR9

SPP queue ID GEN-2021-SR9

Queue request GEN-2021-SR9 was listed in the SPP interconnection queue at the end of 2025 as a 10 MW solar project in Jackson County, MO, according to Berkeley Lab’s queue data file. The filing names Hawthorn Power Plant as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of January 11, 2023.

Queue IDGEN-2021-SR9
Project nameNot reported
Status (as published)Operational
SubstationHawthorn Power Plant
Point of interconnectionHawthorn Power Plant
CountyJackson
StateMO
VoltageNot reported
Capacity10 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2023-01-11
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Jackson, MO: 24 requests in the SPP queue, 11 active totaling 2,163.9 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityKCPL
ClusterSurplus
Interconnection serviceNRIS/ERIS
Project typeSurplus
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/COMMERCIAL OPERATION
Queue date2021-08-24
Operational date2023-01-11

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.