Jackson, MO interconnection queue

11 active projects totaling 2,163.9 MW in the SPP queue, plus 13 with terminal status (shown grayed).

11active projects
2,163.9active MW
24total filed
Queue IDProjectkVMWResourceStatus
GEN-2024-207 Not reported 161 778.6 Gas Active
GEN-2000-008 Not reported n/r 560 Gas Withdrawn
GEN-2011-052 Not reported 161 250 Gas Withdrawn
GEN-2024-217 Not reported 345 250 Battery Active
GEN-2024-206 Not reported 161 226.3 Gas Active
GEN-2018-096 Not reported 345 205 Solar Withdrawn
GEN-2018-102 Not reported 161 200 Solar Withdrawn
GEN-2018-103 Not reported 161 200 Solar Withdrawn
GEN-2022-144 Not reported 161 200 Battery Active
GEN-2023-021 Not reported 161 200 Battery Withdrawn
GEN-2024-074 Not reported 161 200 Battery Active
GEN-2024-352 Not reported 345 199 Battery Active
GEN-2023-036 Not reported 161 165 Battery Withdrawn
GEN-2023-058 Not reported 161 150 Battery Withdrawn
GEN-2023-171 Not reported 161 150 Battery Active
GEN-2018-095 Not reported 345 100 Battery Withdrawn
GEN-2018-104 Not reported 345 100 Battery Withdrawn
GEN-2022-031 Not reported 161 100 Battery Withdrawn
GEN-2021-GR1 Not reported 69 88 Other Withdrawn
GEN-2018-031 Not reported 161 50 Battery Active
GEN-2019-048 Not reported 69 50 Battery Withdrawn
GEN-2021-042 Not reported 161 50 Battery Active
GEN-2025-SR18 Not reported 161 50 Other Active
GEN-2021-SR9 Not reported n/r 10 Solar Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.