Jackson, MO interconnection queue
11 active projects totaling 2,163.9 MW in the SPP queue, plus 13 with terminal status (shown grayed).
11active projects
2,163.9active MW
24total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2024-207 | Not reported | 161 | 778.6 | Gas | Active |
| GEN-2000-008 | Not reported | n/r | 560 | Gas | Withdrawn |
| GEN-2011-052 | Not reported | 161 | 250 | Gas | Withdrawn |
| GEN-2024-217 | Not reported | 345 | 250 | Battery | Active |
| GEN-2024-206 | Not reported | 161 | 226.3 | Gas | Active |
| GEN-2018-096 | Not reported | 345 | 205 | Solar | Withdrawn |
| GEN-2018-102 | Not reported | 161 | 200 | Solar | Withdrawn |
| GEN-2018-103 | Not reported | 161 | 200 | Solar | Withdrawn |
| GEN-2022-144 | Not reported | 161 | 200 | Battery | Active |
| GEN-2023-021 | Not reported | 161 | 200 | Battery | Withdrawn |
| GEN-2024-074 | Not reported | 161 | 200 | Battery | Active |
| GEN-2024-352 | Not reported | 345 | 199 | Battery | Active |
| GEN-2023-036 | Not reported | 161 | 165 | Battery | Withdrawn |
| GEN-2023-058 | Not reported | 161 | 150 | Battery | Withdrawn |
| GEN-2023-171 | Not reported | 161 | 150 | Battery | Active |
| GEN-2018-095 | Not reported | 345 | 100 | Battery | Withdrawn |
| GEN-2018-104 | Not reported | 345 | 100 | Battery | Withdrawn |
| GEN-2022-031 | Not reported | 161 | 100 | Battery | Withdrawn |
| GEN-2021-GR1 | Not reported | 69 | 88 | Other | Withdrawn |
| GEN-2018-031 | Not reported | 161 | 50 | Battery | Active |
| GEN-2019-048 | Not reported | 69 | 50 | Battery | Withdrawn |
| GEN-2021-042 | Not reported | 161 | 50 | Battery | Active |
| GEN-2025-SR18 | Not reported | 161 | 50 | Other | Active |
| GEN-2021-SR9 | Not reported | n/r | 10 | Solar | Operational |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.