Substation Scout

SPP request GEN-2021-107

SPP queue ID GEN-2021-107

Queue request GEN-2021-107 was listed in the SPP interconnection queue at the end of 2025 as a 201.6 MW solar project in Pottawatomie County, KS, according to Berkeley Lab’s queue data file. The filing names Evergy Jeffrey Energy Center as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 1, 2026.

Queue IDGEN-2021-107
Project nameNot reported
Status (as published)Active
SubstationEvergy Jeffrey Energy Center
Point of interconnectionEvergy 345kV Jeffrey Energy Center
CountyPottawatomie
StateKS
Voltage345 kV
Capacity201.6 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2026-12-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Pottawatomie, KS: 3 requests in the SPP queue, 2 active totaling 922.8 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityWERE
ClusterDISIS-2021-001; 03 CENTRAL
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Facility Study
Study phase (as the queue printed it)FACILITY STUDY STAGE
Queue date2021-05-20

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first