Pottawatomie, KS interconnection queue
2 active projects totaling 922.8 MW in the SPP queue, plus 1 with terminal status (shown grayed).
2active projects
922.8active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2007-023 | Not reported | n/r | 800 | Coal | Withdrawn |
| GEN-2024-249 | Not reported | 345 | 721.2 | Gas | Active |
| GEN-2021-107 | Not reported | 345 | 201.6 | Solar | Active |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.