SPP request GEN-2021-103

SPP queue ID GEN-2021-103

Queue request GEN-2021-103 was listed in the SPP interconnection queue at the end of 2025 as a 150 MW battery project in Johnson County, KS, according to Berkeley Lab’s queue data file. The filing names Evergy's Atlantic Substation115kV bus as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of March 31, 2030.

Queue IDGEN-2021-103
Project nameNot reported
Status (as published)Active
SubstationEvergy's Atlantic Substation115kV bus
Point of interconnectionEvergy's Atlantic Substation115kV bus
CountyJohnson
StateKS
Voltage115 kV
Capacity150 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2030-03-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Johnson, KS: 12 requests in the SPP queue, 3 active totaling 778.4 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityWERE
ClusterDISIS-2021-001; 03 CENTRAL
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/ON SCHEDULE
Queue date2021-05-25

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.