Johnson, KS interconnection queue

3 active projects totaling 778.4 MW in the SPP queue, plus 9 with terminal status (shown grayed).

3active projects
778.4active MW
12total filed
Queue IDProjectkVMWResourceStatus
GEN-2001-002 Not reported n/r 640 Gas Withdrawn
GEN-2001-001 Not reported n/r 620 Gas Withdrawn
GEN-2017-195 Not reported 345 500.4 Solar Active
GEN-2017-224 Not reported 345 302.4 Solar Withdrawn
GEN-2017-228 Not reported 345 302.4 Solar Withdrawn
GEN-2017-147 Not reported 345 252 Wind Withdrawn
GEN-2018-126 Not reported 161 250 Solar Withdrawn
GEN-2021-103 Not reported 115 150 Battery Active
GEN-2023-007 Not reported 345 150 Battery Withdrawn
GEN-2017-196 Not reported 345 128 Battery Active
GEN-2017-225 Not reported 345 76 Battery Withdrawn
GEN-2017-229 Not reported 345 76 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first