SPP request GEN-2021-096

SPP queue ID GEN-2021-096

Queue request GEN-2021-096 was listed in the SPP interconnection queue at the end of 2025 as a 500 MW solar project in Coffey County, KS, according to Berkeley Lab’s queue data file. The filing names Wolf Creek - Benton as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 1, 2027.

Queue IDGEN-2021-096
Project nameNot reported
Status (as published)Active
SubstationWolf Creek - Benton
Point of interconnectionWolf Creek - Benton 345 kV
CountyCoffey
StateKS
Voltage345 kV
Capacity500 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2027-12-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Coffey, KS: 12 requests in the SPP queue, 5 active totaling 991 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityWERE
ClusterDISIS-2021-001; 03 CENTRAL
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Facility Study
Study phase (as the queue printed it)FACILITY STUDY STAGE
Queue date2021-04-29

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.