Coffey, KS interconnection queue

5 active projects totaling 991 MW in the SPP queue, plus 7 with terminal status (shown grayed).

5active projects
991active MW
12total filed
Queue IDProjectkVMWResourceStatus
GEN-2022-186 Not reported 345 684 Solar Withdrawn
GEN-2021-096 Not reported 345 500 Solar Active
GEN-2023-122 Not reported 345 250 Solar Withdrawn
GEN-2024-139 Not reported 345 250 Solar Active
GEN-2010-017 Not reported 345 199.8 Wind Withdrawn
GEN-2009-048 Not reported 345 102 Wind Withdrawn
GEN-2009-049 Not reported 345 102 Wind Withdrawn
GEN-2009-050 Not reported 345 102 Wind Withdrawn
GEN-2008-099 Not reported n/r 100 Wind Withdrawn
GEN-2008-098 Not reported 345 99.5 Wind Operational
GEN-2010-003 Not reported 345 99.5 Wind Operational
GEN-2008-021 Not reported 345 42 Nuclear Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.