SPP request GEN-2021-035

SPP queue ID GEN-2021-035

Queue request GEN-2021-035 was listed in the SPP interconnection queue at the end of 2025 as a 113 MW solar project in Grant County, KS, according to Berkeley Lab’s queue data file. The filing names Tap Sunflower Santana Transmission Line as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 31, 2026.

Queue IDGEN-2021-035
Project nameNot reported
Status (as published)Active
SubstationTap Sunflower Santana Transmission Line
Point of interconnectionTap Sunflower Santana 115kV Transmission Line
CountyGrant
StateKS
Voltage115 kV
Capacity113 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2026-12-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Grant, KS: 6 requests in the SPP queue, 3 active totaling 539.2 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilitySUNC
ClusterDISIS-2021-001; 03 CENTRAL
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Facility Study
Study phase (as the queue printed it)FACILITY STUDY STAGE
Queue date2021-05-14

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first