Queue request GEN-2020-020 was listed in the SPP interconnection queue at the end of 2025 as a 201.6 MW hybrid project in Mccurtain County, OK, according to Berkeley Lab’s queue data file. The filing names Tap the Northwest Texarkana - Valliant line as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of November 15, 2027.

Queue IDGEN-2020-020
Project nameNot reported
Status (as published)Active
SubstationTap the Northwest Texarkana - Valliant line
Point of interconnectionTap the 345 kV Northwest Texarkana - Valliant line
CountyMccurtain
StateOK
Voltage345 kV
Capacity201.6 MW
Resource (as published)Solar+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2027-11-15
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Mccurtain, OK: 6 requests in the SPP queue, 2 active totaling 356.6 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAEP
ClusterDISIS-2020-001; 04 SOUTHEAST
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/ON SCHEDULE
Queue date2020-04-28
Components (hybrid)Solar 201.6 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first