Mccurtain, OK interconnection queue

2 active projects totaling 356.6 MW in the SPP queue, plus 4 with terminal status (shown grayed).

2active projects
356.6active MW
6total filed
Queue IDProjectkVMWResourceStatus
GEN-2000-004 Not reported n/r 800 Gas Withdrawn
GEN-2000-009 Not reported n/r 500 Gas Withdrawn
GEN-2020-020 Not reported 345 201.6 Hybrid Active
GEN-2021-063 Not reported 138 155 Hybrid Active
GEN-2022-090 Not reported 138 150 Solar Withdrawn
GEN-2022-091 Not reported 138 150 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.