Queue request GEN-2020-008 was listed in the SPP interconnection queue at the end of 2025 as a 250 MW hybrid project in Stevens County, KS, according to Berkeley Lab’s queue data file. The filing names Corporation Carpenter Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 21, 2028.

Queue IDGEN-2020-008
Project nameNot reported
Status (as published)Active
SubstationCorporation Carpenter Substation
Point of interconnectionCorporation Carpenter 345kV Substation
CountyStevens
StateKS
Voltage345 kV
Capacity250 MW
Resource (as published)Solar+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2028-06-21
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Stevens, KS: 15 requests in the SPP queue, 3 active totaling 650 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilitySPS
ClusterDISIS-2020-001; 03 CENTRAL
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/ON SCHEDULE
Queue date2020-04-22
Components (hybrid)Solar 250 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.