Stevens, KS interconnection queue
3 active projects totaling 650 MW in the SPP queue, plus 12 with terminal status (shown grayed).
3active projects
650active MW
15total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2022-059 | Not reported | 345 | 500 | Wind | Withdrawn |
| GEN-2022-076 | Not reported | 345 | 500 | Solar | Withdrawn |
| GEN-2020-008 | Not reported | 345 | 250 | Hybrid | Active |
| GEN-2024-032 | Not reported | 115 | 250 | Solar | Active |
| GEN-2007-058 | Not reported | n/r | 202 | Wind | Withdrawn |
| GEN-2007-059 | Not reported | n/r | 202 | Wind | Withdrawn |
| GEN-2022-202 | Not reported | 345 | 200 | Wind | Withdrawn |
| GEN-2024-096 | Not reported | 345 | 200 | Solar | Withdrawn |
| GEN-2003-013 | Not reported | n/r | 198 | Wind | Withdrawn |
| GEN-2022-215 | Not reported | 345 | 154 | Solar | Withdrawn |
| GEN-2021-021 | Not reported | 345 | 150 | Wind | Active |
| GEN-2009-062 | Not reported | n/r | 115 | Gas | Withdrawn |
| GEN-2002-018 | Not reported | n/r | 100.8 | Wind | Withdrawn |
| GEN-2011-047 | Not reported | n/r | 22.5 | Gas | Withdrawn |
| GEN-2012-003 | Not reported | 69 | 22.5 | Gas | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.