Stevens, KS interconnection queue

3 active projects totaling 650 MW in the SPP queue, plus 12 with terminal status (shown grayed).

3active projects
650active MW
15total filed
Queue IDProjectkVMWResourceStatus
GEN-2022-059 Not reported 345 500 Wind Withdrawn
GEN-2022-076 Not reported 345 500 Solar Withdrawn
GEN-2020-008 Not reported 345 250 Hybrid Active
GEN-2024-032 Not reported 115 250 Solar Active
GEN-2007-058 Not reported n/r 202 Wind Withdrawn
GEN-2007-059 Not reported n/r 202 Wind Withdrawn
GEN-2022-202 Not reported 345 200 Wind Withdrawn
GEN-2024-096 Not reported 345 200 Solar Withdrawn
GEN-2003-013 Not reported n/r 198 Wind Withdrawn
GEN-2022-215 Not reported 345 154 Solar Withdrawn
GEN-2021-021 Not reported 345 150 Wind Active
GEN-2009-062 Not reported n/r 115 Gas Withdrawn
GEN-2002-018 Not reported n/r 100.8 Wind Withdrawn
GEN-2011-047 Not reported n/r 22.5 Gas Withdrawn
GEN-2012-003 Not reported 69 22.5 Gas Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.