Substation Scout

SPP request GEN-2020-007

SPP queue ID GEN-2020-007

Queue request GEN-2020-007 was listed in the SPP interconnection queue at the end of 2025 as a 650 MW hybrid project in Linn County, KS, according to Berkeley Lab’s queue data file. The filing names Evergy La Cygne to Wolf Creek Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of July 25, 2028.

Queue IDGEN-2020-007
Project nameNot reported
Status (as published)Active
SubstationEvergy La Cygne to Wolf Creek Substation
Point of interconnectionEvergy La Cygne to Wolf Creek 345kV Substation
CountyLinn
StateKS
Voltage345 kV
Capacity650 MW
Resource (as published)Solar+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2028-07-25
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Linn, KS: 5 requests in the SPP queue, 3 active totaling 1,414.1 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityKCPL
ClusterDISIS-2020-001; 03 CENTRAL
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/ON SCHEDULE
Queue date2020-04-22
Components (hybrid)Solar 650 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.