3 active projects totaling 1,414.1 MW in the SPP queue, plus 2 with terminal status (shown grayed).

3active projects
1,414.1active MW
5total filed
Queue IDProjectkVMWResourceStatus
GEN-2020-007 Not reported 345 650 Hybrid Active
GEN-2021-030 Not reported 345 510.3 Solar Active
GEN-2021-029 Not reported 345 253.8 Battery Active
GEN-2018-054 Not reported 161 120 Solar Withdrawn
GEN-2018-114 Not reported 161 40 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.