SPP request GEN-2018-079

SPP queue ID GEN-2018-079

Queue request GEN-2018-079 was listed in the SPP interconnection queue at the end of 2025 as a 148 MW solar project in Craig County, OK, according to Berkeley Lab’s queue data file. The filing names Farmland-Delaware line as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 31, 2029.

Queue IDGEN-2018-079
Project nameNot reported
Status (as published)Active
SubstationFarmland-Delaware line
Point of interconnectionFarmland-Delaware 138kV line
CountyCraig
StateOK
Voltage138 kV
Capacity148 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2029-12-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Craig, OK: 8 requests in the SPP queue, 1 active totaling 148 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAEP
ClusterDISIS-2018-002; 04 SOUTHEAST
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/ON SCHEDULE
Queue date2018-11-18

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.